
SALMOLEBONSKI PARK 2.0 | ARZACHENA, SARDINIA 2026
Salmo built a park in Gallura and opened it with his own name on the bill.
On 25 July 2026 the Lebonski Park opened on the old Monte Aguisi racetrack at the entrance to Arzachena, thirty four hectares of Sardinia turned into a fairground with an arena inside it. Twenty thousand people came through. Parking opened at 13:00, the park at 14:30, the Saborè stage at 15:00, the main stage at 18:00. Salmo went on at 22:00, after Scar, Shari and Good Intention, and the night carried Gabry Ponte, Nitro, Noyz Narcos and Centomilacarie across the stage before the dj sets took it to one in the morning. On Fire, Russell Crowe, 1984, Daytona, 90 Min, and Gambale twist for the Barritas, because the room was Sardinian.
The project never asked for a concept to defend. This was an artist from Olbia opening a permanent venue in his own region, a festival he organised himself, a celebration of the place he comes from. The design took its terms from that: an open field, a bill that changes hands all night, and one moment at ten o'clock when the man from up the road walks on.
Blearred designed the lighting and the set, and directed the lighting of the show. The rig held still. No motorised truss, no reveal, so everything the audience read as movement came out of the light itself. In a field that size, with the arena open on every side and no architecture to lean on, the rig had to draw its own room and keep drawing it while the stage changed hands.
The design was built and tested in virtual environments through the spring and preprogrammed before it travelled, so the days in Arzachena went into fitting it to the real field instead of inventing it there.
Davide Pedrotti signed the lighting design and the set design. Matteo Moro preprogrammed the show and operated it on site. In the studio, Matteo Masini developed the design in software, Marzio Del Sole built the 3D models, Francesco Rizzotto drew the CAD, Elisa Fiumanò ran logistics and Ivan Russo held the budget. Michele Montesi was production manager. Video was handled by Reef Studios, with Andrea Folino and his team. The event was produced by Vivo Concerti and Lebonski360 with the Comune di Arzachena.
The park stayed open to the public from 31 July to 23 August. The arena stays after that.
He did not carry a show home. He built the home, then played it.
Photo: @serafeeni
Blearred Team
- Team
- Davide Pedrotti, Jordan Babev, Ivan Russo, Matteo Moro, Elisa Fiumanò, Marzio Del Sole, Matteo Masini, Francesco Rizzotto





